UAB

September 11th, 2019 | by CollegeAD
UAB
0

The Birmingham Design Review Committee this morning approved plans for the external materials to be used at Protective Stadium. The $174 million open air stadium will sit between Top Golf and the Birmingham Sheraton hotel and seat about 45,000 people. The stadium to be complete by the 2021 UAB Blazers’ football season and will be the future home of the Blazers. The external materials include those to be used on the sidewalks and walkways visible from outside the stadium as well as the planned lighting, landscaping and building materials. -Anna Beahm, AL. Read More.

About CollegeAD
Have a tip, job posting, or press release for CollegeAD? Email us at [email protected], or direct message @collegead. Sources always remain anonymous.

Comments are closed.


A Briefing Of The Day's College Athletics News
To Your Inbox Tonight.

* indicates required